Overview

License of the project which covers 33211 hectares was approved in July 2021 and is valid for 4 years. The project simply has potential to generate minimum USD ten billion revenue. Only copper was used in the simulation. It can be noted in the economic overview presentation that further work is needed to test many variables of the deposit. Other base metals, silver, zinc and cobalt were left out (this is what needs to be tested). A detailed preliminary exploration report and all other supporting background data is available.

Only test drilling data is available where the closest drilling data with resources available is about 2km and furthest about 5km away from our licence boundary. As a result resources can only be extrapolated but not declared until tested by investing in diamond drilling at present.